Restaurant and café fit-out in Dubai: front of house and kitchen under one contract

Widget Tech fits out restaurants and cafés in Dubai under one contract: the front of house you show customers and the kitchen, extraction, drainage and fire systems behind it, with one contact from site visit to opening day. Restaurant fit-out contractors who only do the pretty half leave you managing the hard half yourself.

10+ projects delivered in Dubai · Reply in under an hour · Site visit within 48 hours

Restaurant and café fit-out in Dubai at a glance

What it coversFront of house (seating, counter, floors, ceilings, lighting, washrooms) and back of house (kitchen layout, extraction, drainage and grease trap, cooking services, cold rooms, fire suppression).
Who it is forRestaurant and café operators in JLT, Dubai Marina, Business Bay, Downtown, Jumeirah, Al Quoz, Deira and across Dubai.
Mall or street unitBoth. Mall units follow the mall’s fit-out guidelines and inspection stages; street and building units start with the landlord NOC and a confirmed extraction route.
How long it takesWeeks for a small café in an existing unit, months for a full restaurant with a new kitchen; the extraction route often decides the programme.
ApprovalsLandlord or mall NOC, Dubai Municipality kitchen layout assessment, fit-out permit, Civil Defence, and the food establishment permit at the end. We handle the submissions. See our restaurant approvals guide.
How quoting worksSite visit first, then a written quote itemised by trade with material grades named, and a dated programme.
How fast we respondReply to new enquiries in under an hour (Monday to Friday, 10:00 to 18:00), site visit within 24 to 48 hours, and a written quote within 24 to 48 hours of the visit.
CompanyWidget Tech Project Management Services LLC, office in Al Garhoud. 10+ projects delivered in Dubai. Dubai only.

What does a restaurant fit-out include?

Two halves that have to be built together: the front of house (seating, counter, flooring, ceilings, lighting, washrooms) and the back of house (kitchen layout, extraction and fresh air, drainage and grease trap, gas or electric cooking services, cold rooms, fire suppression). Under one contract the kitchen services are in before the front-of-house finishes go on.

Front of houseBack of house
Counter and bar joineryKitchen extraction hood and ducting, fresh-air supply
Seating layout, flooring, ceilings, lightingDrainage falls, floor gullies, grease trap
Washrooms and accessibilityCold room and dry store power and cooling
Shopfront, signage-ready fasciaFire suppression over cooking line, fire detection
AC balanced for a full roomCooking gas or electrical capacity, water heaters

How does a restaurant fit-out run, step by step?

The order matters more than the speed of any single trade, because a kitchen built before its layout is approved is the most expensive thing to redo.

1. Menu and equipment listFixed first. The kitchen is drawn around the cooking line, not the other way round.
2. Site visitWe check the unit, the extraction route and the drainage connection with the landlord or mall before anything is drawn.
3. Kitchen layout and drawingsRaw and cooked food flows, washing, storage and the equipment layout, ready for the Dubai Municipality layout assessment.
4. Approvals in parallelFit-out permit, food safety layout and Civil Defence submitted together with complete drawings, not one after another.
5. Back of house firstExtraction, drainage, grease trap, gas or electrical capacity and fire suppression, tested before ceilings and floors close.
6. Front of houseCounter and bar joinery, seating, flooring, ceilings, lighting, washrooms and the shopfront.
7. Inspections and handoverCivil Defence and food safety inspections of the finished kitchen, a snag list at zero, then your opening date.

A small café in an existing unit takes weeks; a full restaurant with a new kitchen and extraction takes months, and the extraction route often decides the programme. An approvals consultancy puts the combined fit-out permit, food safety and Civil Defence approvals at about 3 to 8 weeks when submitted in parallel (Dar Al Naseeb, March 2026, cited in our approvals guide). You get a dated programme with the quote.

What affects the cost of a restaurant fit-out in Dubai?

A restaurant or café fit-out in Dubai is priced mainly by the kitchen: extraction, drainage, gas and fire suppression cost more than the dining room. These are the items that move the price:

Kitchen extraction routeA unit with an existing, approved duct route costs far less than one that needs a new duct through the building.
Drainage and grease trapMoving drainage or adding a grease trap means breaking the floor; trap size depends on the kitchen area and menu.
Gas or electric cookingLPG needs its own Civil Defence approval, enclosure and gas detection; electric cooking may need more power from DEWA.
Fire suppressionA wet chemical system over the cooking line is required and sized to the hood.
Front-of-house finishesCustom joinery, imported tiles and feature lighting against standard finishes.
Time to openingA compressed programme adds night and weekend shifts.

As a published benchmark, one Dubai fit-out contractor lists restaurant fit-out at AED 500 to 1,200 per sq ft and restaurant renovation at AED 140 to 600 per sq ft (Designsmith, checked 10 October 2026). Approval fees are separate and listed in our approvals guide. We quote your unit after a site visit, itemised by front of house and back of house, so you see the kitchen cost on its own.

What approvals does a restaurant fit-out need in Dubai?

Restaurants carry more approvals than any other fit-out. In order:

Landlord or mall NOCConsent to the works and to food use of the unit
Dubai Municipality kitchen layout assessmentThe kitchen design, before construction
Fit-out permitThe works package, from Dubai Municipality, DDA, Trakhees or the free zone that governs the plot
Civil DefenceKitchen suppression, detection, escape routes and the extract; LPG has its own approval
Food establishment permitConsent to operate, after inspection of the finished kitchen

We tell you which apply to your unit at the site visit and handle the submissions as part of the contract. Our guide to restaurant fit-out approvals in Dubai sets out each one with published times and fees.

Can you renovate a restaurant while it keeps trading?

Yes. A trading restaurant is renovated in phases: dining areas closed one at a time, noisy work overnight or before opening, and the kitchen closed for the shortest window the work allows. Before any area reopens it is cleaned and snagged. If the kitchen layout itself changes, plan for it to go back to Dubai Municipality food safety for assessment before the work starts. Our restaurant renovation page sets out how a phased renovation runs and what has to close.

Have you renovated a restaurant in Dubai while it stayed open?

Yes. A recent job was a restaurant in Jumeirah with 50 to 100 seats that kept trading for the whole job. The noisy and dusty work was done at night after closing, so the restaurant kept serving guests during opening hours. Kitchen works, MEP and air conditioning, and flooring and finishes were handed over in 2 to 4 weeks.

LocationJumeirah, Dubai
Size50 to 100 seats
ScopeKitchen works, MEP and air conditioning, flooring and finishes
Duration2 to 4 weeks from start to handover
How it stayed openNoisy and dusty work done at night, after closing
ClientName withheld (confidential)

Read the full Jumeirah restaurant case study.

Café fit-out: what is different?

A café is usually counter-led with a smaller kitchen, or no cooking at all. The work concentrates on the counter and display joinery, the coffee machine’s water supply, drainage and dedicated power, display chillers, seating and lighting. Cafés are often in malls or on the ground floor of residential and office buildings, so the mall or building fit-out guidelines usually set the working hours and inspections. With a smaller kitchen, the programme is shorter than a full restaurant.

Why one contractor for the whole restaurant?

Because the kitchen and the dining room share a ceiling, a floor and a drainage run. When separate contractors build them, the extraction duct arrives after the ceiling is closed and the grease trap after the floor is tiled. One contract, one sequence, one snag list.

Comparing contractors? Our guide to restaurant fit-out companies in Dubai compares what seven companies publish about kitchens, extraction and approvals, and what to ask each one.

Which areas of Dubai do you cover?

Restaurants and cafés across Dubai, with a focus on Dubai Marina, JBR, JLT, Jumeirah, Business Bay, Sheikh Zayed Road and Dubai Festival City, including mall units. Our office is in Al Garhoud. We work in Dubai only.

See also: fit-out and renovation in Business Bay.

Questions

Frequently asked questions

How much does a restaurant fit-out cost in Dubai?+

It depends mostly on the kitchen: the extraction route, drainage, gas or electric cooking and fire suppression. One Dubai contractor publishes AED 500 to 1,200 per sq ft for a restaurant fit-out and AED 140 to 600 per sq ft for a renovation (Designsmith, checked 10 October 2026). We quote after a site visit, with the kitchen priced separately.

How long does a restaurant fit-out take in Dubai?+

Weeks for a small café in an existing unit, months for a full restaurant with a new kitchen and extraction. Approvals run in parallel with the drawings, and the extraction route often decides the programme. You get a dated programme with the quote.

What approvals does a restaurant need before opening in Dubai?+

The landlord or mall NOC, the Dubai Municipality kitchen layout assessment, a fit-out permit, Civil Defence approval and, after the final inspection, the food establishment permit. We handle the submissions.

Can you renovate a restaurant while it stays open?+

Yes, in phases, with noisy work overnight or before opening and the kitchen closed for the shortest possible window.

Do you supply kitchen equipment?+

We build the services for it and coordinate with your equipment supplier so power, gas, water and drainage land where each unit needs them.

Can you fit out a café in a mall?+

Yes. Mall units have their own fit-out guidelines and inspection stages; we work to them and include them in the programme.

Do you offer maintenance after opening?+

A single restaurant is covered by the written warranty on the fit-out. If you own or manage the whole building, we also offer a building maintenance contract.

Get a written quote for your restaurant or café fit-out

Send the floor plan or a few photos of the unit and your opening date. We visit, then send a written quote and programme itemised by trade.


Prefer WhatsApp? Message us or call +971 56 108 3786. Mon–Fri 10:00–18:00.

We use your details only to reply and prepare your quote. See our privacy policy.

Get in touch directly

📞
WhatsApp or call+971 56 108 3786
📍
OfficeSarah Building, Office 301, Al Garhoud, Dubai, U.A.E.
🕘
Business hoursMon–Fri 10:00–18:00 · Sat–Sun closed

Villa, kitchen, bathroom and building renovation, office, restaurant and retail fit-out, MEP works and annual maintenance. Dubai only.

Widget Tech · Sarah Building, Office 301, Al Garhoud, Dubai, U.A.E. · +971 56 108 3786 · info@thewidgettech.com · Mon–Fri 10:00–18:00

CallGet a quote
Scroll to Top