Renovated kitchen in a Dubai villa
Home / Services / Kitchen renovation
Kitchen renovation · Dubai only

Kitchen renovation in Dubai: layout, services and cabinetry under one contract

Kitchen renovation in Dubai from Widget Tech covers the whole room under one contract: the layout, the plumbing and electrical moved to suit it, the ventilation, the cabinetry and worktops, the tiling and the finish, with one contact from site visit to handover. The kitchen is the most expensive room in a villa to renovate and the one where a wrong sequence costs the most.

10+ projects delivered in Dubai · Reply in under an hour · Site visit within 48 hours

Kitchen renovation in Dubai at a glance

What it coversStrip-out, services (water, drainage, power, extraction, AC), walls and floors, cabinetry, worktops, splashback and appliances.
Who it is forVilla and apartment owners across Dubai; in apartment buildings we handle the building management’s permission.
Project sizeFrom a single office or kitchen up to whole buildings, including multi-tower developments and villa communities.
How long it takesWeeks, not days; the joinery lead time usually sets the pace. The programme shows the days the kitchen is out of use.
Layout changesYes. Moving the sink or cooker is MEP work under the same contract.
PricePublished 2026 ranges are in our kitchen renovation cost guide.
How quoting worksSite visit first, then a written quote itemised by trade with material grades named, and a dated programme.
How fast we respondReply to new enquiries in under an hour (Monday to Friday, 10:00 to 18:00), site visit within 24 to 48 hours, and a written quote within 24 to 48 hours of the visit.
CompanyWidget Tech Project Management Services LLC, office in Al Garhoud. 10+ projects delivered in Dubai. Dubai only.

What does a kitchen renovation include?

Strip-out, then the services (water, drainage, power for appliances, extraction, AC), then walls and floors, then cabinetry, worktops, splashback and appliances. Doing it in that order is the difference between a kitchen that looks new and one that works new.

StageWhat happens
Design and layoutAgree the plan, appliance positions and worktop material before the quote is fixed
Strip-outRemove old cabinetry, tiles and fittings; check what is behind them
ServicesMove or add water, drainage, power and extraction to the new layout
Walls and floorsPlaster, waterproofing where needed, tiling
Cabinetry and worktopsInstall joinery, stone or engineered worktops, splashback
Appliances and finishConnect appliances, lighting, paint, snag list to zero

What affects the cost of a kitchen renovation in Dubai?

A typical 10 m² apartment kitchen in Dubai with new cabinets and a quartz worktop costs about AED 45,000 to 70,000 (Bestimate, 2026). Published 2026 guides range from about AED 8,000 for a cosmetic refresh to AED 260,000 and above for a full remodel with a new layout. These are third-party figures, not Widget Tech prices. Here is what drives the cost:

CabinetryStandard carcasses and doors against solid wood, lacquer or designer ranges.
WorktopLaminate against quartz, granite or marble.
AppliancesFreestanding against integrated, and the brand.
Plumbing changesMoving the sink or dishwasher means new drainage and water runs; keeping positions costs less.
VentilationA hood ducted outside against a recirculating hood.
Electrical capacityHigh-power appliances can need new circuits, a board upgrade or extra load from DEWA.

We quote after a site visit with the worktop material and appliance brands named. For published 2026 kitchen renovation costs in Dubai and what moves them, read our kitchen renovation cost guide.

How long does a kitchen renovation take?

Weeks, not days, and the joinery lead time usually sets the pace. You get a dated programme with the quote, including the days the kitchen is out of use.

Can you change the kitchen layout?

Yes. Moving the sink or the cooker means moving drainage, water and power, which is MEP work covered under the same contract, so the layout, services and finishes are planned together.

Do you renovate kitchens in apartments as well as villas?

Yes, across Dubai. In apartment buildings we handle the building management’s permission and work to the building’s hours.

Questions

Frequently asked questions

Do you supply the cabinetry?+

Yes, to the specification in the quote, or we install joinery you have chosen from a supplier.

Can I keep using the kitchen during the work?+

Not during strip-out and services. We tell you the exact days in the programme.

Which areas of Dubai?+

All of Dubai. Dubai only.

Get a written quote for your kitchen renovation

Send a few photos and a list of what you want changed. We book a site visit and come back with a written quote itemised by trade.


Prefer WhatsApp? Message us or call +971 56 108 3786. Mon–Fri 10:00–18:00.

We use your details only to reply and prepare your quote. See our privacy policy.

Get in touch directly

📞
WhatsApp or call+971 56 108 3786
📍
OfficeSarah Building, Office 301, Al Garhoud, Dubai, U.A.E.
🕘
Business hoursMon–Fri 10:00–18:00 · Sat–Sun closed

Villa, kitchen, bathroom and building renovation, office, restaurant and retail fit-out, MEP works and annual maintenance. Dubai only.

Widget Tech · Sarah Building, Office 301, Al Garhoud, Dubai, U.A.E. · +971 56 108 3786 · info@thewidgettech.com · Mon–Fri 10:00–18:00

CallGet a quote
Scroll to Top